Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 3

T-469

Michael Kilgore

Before

Before

Cost: $576,422
Client: PennDOT District 3-0
Contact: Tim Bolton, P.E. (570-368-4328)
Project Letting: September 2019

Bridge Replacement - Snyder County - Spring Township - The project involved the replacement of an existing single span steel I-beam bridge carrying T-469 (Sawmill Road) over Swift Run with a 22’-0” x 8’-0” precast reinforced concrete box culvert and precast reinforced concrete end sections. The project also included 525’ of approach roadway work.

 

S.R. 0147, Section 110 & S.R. 0011, Section 113

Michael Kilgore

IMG_4415.JPG
IMG_4411.JPG

Cost: $13.7 million
Client: PennDOT District 3-0
Contact: Chris Neidig (570-368-4391)
Project Letting: April 20, 2017

Northumberland County - This project consisted of 2.14 miles of Urban Regional Arterial roadway reconstruction in the Borough of Northumberland where the two high volume routes converge. A detailed multi-phase (15 total with detailed sub-phases) traffic control sequence was developed and coordinated with the community, including business owners, emergency services, residents, and public officials. The phases include mini-detours through the community carefully designated to minimize the duration the local streets are utilized for routing traffic during construction. The project also includes numerous ADA ramps, two signals, and sewer and waterline relocations. An extensive Subsurface Utility Investigation (SUE) was performed to aid in identifying impacts and assess the drainage and utility relocation designs. Several overhead utilities are being relocated and coordinated as part of the project.

S.R. 0006, Section 106

Michael Kilgore

Project Cost: $2.064 million
Client: Dolomite Products Co., DBA A.L. Blades
Contact: Mr. William Pilero (607-324-3636)
Project Letting: September 2011.

Bridge Replacement/Rehabilitation - Bradford County -  This project was a design-build two-bridge replacement/rehabilitation project. The project included the replacement of a single span bridge carrying S.R. 0006 over Sugar Creek and the superstructure replacement of a bridge carrying S.R. 0006 over a Branch of Sugar Creek. The replacement bridge is a single-span (65.3’ span) P/S Spread Box Beam Integral Abutment Bridge. The superstructure replacement was also a single-span (32’ span) P/S Spread Box Beam Bridge constructed on modified existing abutments. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor.