Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: SR 147-110

S.R. 0147, Section 110 & S.R. 0011, Section 113

Michael Kilgore

IMG_4415.JPG
IMG_4411.JPG

Cost: $13.7 million
Client: PennDOT District 3-0
Contact: Chris Neidig (570-368-4391)
Project Letting: April 20, 2017

Northumberland County - This project consisted of 2.14 miles of Urban Regional Arterial roadway reconstruction in the Borough of Northumberland where the two high volume routes converge. A detailed multi-phase (15 total with detailed sub-phases) traffic control sequence was developed and coordinated with the community, including business owners, emergency services, residents, and public officials. The phases include mini-detours through the community carefully designated to minimize the duration the local streets are utilized for routing traffic during construction. The project also includes numerous ADA ramps, two signals, and sewer and waterline relocations. An extensive Subsurface Utility Investigation (SUE) was performed to aid in identifying impacts and assess the drainage and utility relocation designs. Several overhead utilities are being relocated and coordinated as part of the project.