Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 3

S.R. 0011, Sections 114/115 & SR 0487, Section 100

Michael Kilgore

Cost: $6.8 million
Client: PennDOT District 3-0
Contact: Justin Gochenauer, P.E. (717-221-2010)
Project Letting: September 17, 2020

Bloomsburg Reconstruction Project - Columbia County - This project consists of 1.371 miles of urban arterial roadway resurfacing/reconstruction, drainage and guide rail updates, pedestrian facility improvements, retaining walls, intersection safety improvements including new traffic signals, roadway lighting and parking meters, and other miscellaneous items.

T-665

Michael Kilgore

Before

Before

Cost: $787,000
Client: PennDOT District 3-0
Contact: Tim Bolton, P.E. (570-368-4328)
Project Letting: August 2019

Bridge Replacement - Lycoming County - McIntyre and Cascade Townships - The project involved the replacement of an existing single span open-grate steel I-beam bridge carrying T-665 (Pleasant Stream Road) over Pleasant Stream with a single span prestressed concrete spread box beam bridge (59-0” span). The bridge foundations consisted of cantilevered abutments supported by spread footings founded on bedrock. The project also included 375’ of approach roadway work.