Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Spread Box Beam Intergral Abutment Bridge

S.R. 0006, Section 106

Michael Kilgore

Project Cost: $2.064 million
Client: Dolomite Products Co., DBA A.L. Blades
Contact: Mr. William Pilero (607-324-3636)
Project Letting: September 2011.

Bridge Replacement/Rehabilitation - Bradford County -  This project was a design-build two-bridge replacement/rehabilitation project. The project included the replacement of a single span bridge carrying S.R. 0006 over Sugar Creek and the superstructure replacement of a bridge carrying S.R. 0006 over a Branch of Sugar Creek. The replacement bridge is a single-span (65.3’ span) P/S Spread Box Beam Integral Abutment Bridge. The superstructure replacement was also a single-span (32’ span) P/S Spread Box Beam Bridge constructed on modified existing abutments. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor.