S.R. 0006, Section 106
Michael Kilgore
Project Cost: $2.064 million
Client: Dolomite Products Co., DBA A.L. Blades
Contact: Mr. William Pilero (607-324-3636)
Project Letting: September 2011.
Bridge Replacement/Rehabilitation - Bradford County - This project was a design-build two-bridge replacement/rehabilitation project. The project included the replacement of a single span bridge carrying S.R. 0006 over Sugar Creek and the superstructure replacement of a bridge carrying S.R. 0006 over a Branch of Sugar Creek. The replacement bridge is a single-span (65.3’ span) P/S Spread Box Beam Integral Abutment Bridge. The superstructure replacement was also a single-span (32’ span) P/S Spread Box Beam Bridge constructed on modified existing abutments. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor.