Projects

SPK Engineering's past projects

Filtering by Tag: Bridge Replacement

S.R. 1004, Section 450

Michael Kilgore

 

Cost: $4.422 million
Client: PennDOT District 10-0
Contact: Jason Layman, P.E. (724-357-7614)
Project Letting: October 24, 2019

Clymer Ramp Bridge Replacement – Indiana County - – This project consisted of the replacement of a four (4) span steel girder bridge carrying S.R. 1004 over S.R. 0119 with a two (2) span (220’ total length) composite/continuous fabricated steel plate girder bridge. The project also included 681’ of approach roadway reconstruction.

S.R. 3020, Section 350

Michael Kilgore

Final

Final

Cost: $887,020
Client: PennDOT District 10-0
Contact: Eric Buchan, P.E. (724-357-2971)
Project Letting: October 2016

Alum Rock Bridge - This project consisted of a 55’ span total replacement bridge over Turkey Run in Richland Township, Clarion County. The SPK team was retained to expeditiously complete the Final Design initiated by others.

T-665

Michael Kilgore

Before

Before

Cost: $787,000
Client: PennDOT District 3-0
Contact: Tim Bolton, P.E. (570-368-4328)
Project Letting: August 2019

Bridge Replacement - Lycoming County - McIntyre and Cascade Townships - The project involved the replacement of an existing single span open-grate steel I-beam bridge carrying T-665 (Pleasant Stream Road) over Pleasant Stream with a single span prestressed concrete spread box beam bridge (59-0” span). The bridge foundations consisted of cantilevered abutments supported by spread footings founded on bedrock. The project also included 375’ of approach roadway work.