Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 0006 Section A02

Michael Kilgore

Cost: $1.48 million
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Client: Engineering District 2-0
Project Letting - 2007

US 6/Allegheny River Bridge Replacement  - This project included a single span (63’ c/c brgs.) prestressed concrete spread box beam bridge with integral abutments. The abutments and bridge barrier included a brick architectural surface treatment to complement an adjacent historic building. The project included 280’ of approach roadway reconstruction. The project also included minor intersection and roadway improvements on a local street network in Coudersport to accommodate detoured traffic during construction of the bridge. The detour was comprised partially of a pair of one-way roads in a residential community and included two temporary traffic signals. 

 

S.R. 1020 Section A01

Michael Kilgore

Cost: $1.31 million
Client: PennDOT Engineering District 2-0
Contact: Mr. George Uhl (814-765-0480)

Bridge Replacement - Potter County - This project includes a two span (98'-6" c/c brgs.) precast concrete spread box beam bridge over the West Branch of Pine Creek. The project also includes 535' of approach roadway reconstruction.  
 

S.R. 1009 Section A01

Michael Kilgore


 Cost: $482,200
Project Length: 0.133 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Drainage Structure Replacement - This project included a box culvert replacement carrying S.R. 1009 over Ludington Run utilizing a temporary roadway.