SPK Engineering's past projects

Filtering by Category: District 2

S.R. 1001, Section C01 Ribbon Cutting August 30, 2024

Michael Kilgore

SPK Engineering were honored to be a part of this roadway reconstruction, retaining wall and walkway in Clinton County. Today was the ribbon cutting that included representatives from the Woodford Township Board of Supervisors, The Woodward Township Municipal Authority, the Woodford Township Recreation Committee, The Pennsylvania Department of Transportation District 2, the Project Contractor Clearwater Construction, the Clinton County Economic Partnership and the Clinton Country Government.

S.R. 1001, Section C01 (ECMS #3850)

Michael Kilgore

Project Cost: $5.5 million
Client: PennDOT District 2-0
Contact: Mark Kucherer, P.E. (814-765-0440, mkucherer@pa.gov)
Project letting: May 12, 2022
Roadway Reconstruction and Retaining Wall - Clinton County - This project was originally 1.2 miles in length with significant geometric improvements on S.R. 1001 (Farrandsville Road). The project was eventually right-sized to 1,400’ of roadway improvements and reconstruction and included an 800’ tied pile and lagging retaining wall with an integral pedestrian walkway to minimize encroachment on the West Branch of the Susquehanna River.

S.R. 0449, Section A07

Michael Kilgore

After

Before

Cost: $880,586
Client: PennDOT District 2-0
Contact: Mark Kucherer, P.E. (814-765-0440, mkucherer@pa.gov)
Project Letting: July 28, 2022

Structure replacement - Potter County, Ulysses Township - Replacement of a concrete arch culvert carrying S.R. 0449 (North Brooklyn Road) over Pine Creek with a precast concrete box culvert [designed by our subconsultant, Whitman, Requardt & Associates, LLP  (WRA)]. The project also included 517’ of approach roadway reconstruction.