Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Structure Replacement

S.R. 0449, Section A07

Michael Kilgore

After

Before

Cost: $880,586
Client: PennDOT District 2-0
Contact: Mark Kucherer, P.E. (814-765-0440, mkucherer@pa.gov)
Project Letting: July 28, 2022

Structure replacement - Potter County, Ulysses Township - Replacement of a concrete arch culvert carrying S.R. 0449 (North Brooklyn Road) over Pine Creek with a precast concrete box culvert [designed by our subconsultant, Whitman, Requardt & Associates, LLP  (WRA)]. The project also included 517’ of approach roadway reconstruction.

Back

S.R. 4013, Section A03

Michael Kilgore

Before

After

After

After

$1.201 million
Client: PennDOT District 2-0;
Contact: Mark Kucherer, P.E. (814-765-0440, mkucherer@pa.gov);
Project Letting: November 30, 2021

Structure replacement - Potter County, Allegheny Township - Replacement of a 2-span T-beam bridge carrying S.R. 4013 (North Hollow Road) over the Allegheny River with a prestressed bulb-tee bridge (70.5’+ span). The project also included 480’ of approach roadway reconstruction.

S.R. 0850, Section A03

Michael Kilgore

Cost: $321,704
Client: Engineering District 2-0
Contact: Mr. Steve Fantechi, P.E. (814-765-0677)
Project Letting - 2011

 Structure Replacement - Juniata County - This project included the replacement of an existing bridge with a precast concrete box culvert (span - 19’). The project also included 510’ of approach roadway reconstruction.