Projects

SPK Engineering's past projects

Filtering by Tag: Bridge Removal

S.R. 0070 Section N20

Michael Kilgore

Cost: $5.57 million
Project Length: 3,719' (0.704 mile)
Client: Gulisek Construction, LLC
Contact: Mr. Clayton Stahl (724-696-3341)
Project Letting: December 2010

Bridge Replacement - This project is a design-build bridge replacement project. The project included the removal of a single span bridge carrying Interstate 70 (I-70) eastbound and westbound over S.R. 3014. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor. 

 

 

S.R. 3012 Section B10

Michael Kilgore

Cost: $1.94 Mil.
Client: Engineering District 12-0
Contact: Troy Pritts, P.E.(724-415-2401)
Project Letting - July 6, 2006

This project included the development of the Design-Build Contract for the removal and reconstruction of the original bridge carrying S.R. 3012 (County Road) over Sewickley Creek in Sewickley and South Huntingdon Townships. The original bridge was a two (2) span reinforced concrete through-girder bridge (117’ overall span). The structure concept presented in the Design-Build contract was a two (2) span prestressed concrete spread box beam bridge. SPK developed the preliminary design concepts that included an access road and causeway for removal and reconstruction of the center pier. The Department successfully obtained the required Authorization-to-Enter, Non-Waiver of Claim for the impacted properties to permit the construction activities to advance as the Right-of-Way acquisition activities advanced.

 

S.R. 0070 Section 026

Michael Kilgore

Before

$2.47 Million
Client: Engineering District 9-0
Contact: Mr. Randy Swales (814-696-6834)
Project Letting: July 2008

Bridge Replacement - This project is a design/build bridge replacement project. This project is for the removal of the dual three-span bridges carrying the Interstate 70 (I-70) eastbound and westbound lanes over T-390 (Lodge Road) and replacement with a precast concrete arch structure. SPK prepared the concept contract plans, including roadway, traffic control, E&S control, and structure conceptual plans, and provided design review services as well.