S.R. 0522 Section 16B

Michael Kilgore

After

After

Before

After

Project Cost: $441,301
Client: PennDOT District 9-0
Contact: Jacklyn Himmelwright (814-696-7171)
Project Letting: January 2018
Contractor: Wen-Brooke Contracting, Inc.

This project includes the replacement of an existing slab bridge carrying S.R. 0522 over Tributary to Big Cove Creek. After reviewing the site constraints, including utilities, buildings, and a billboard, and the difficulties associated with phasing the replacement, SPK, in conjunction with PennDOT, decided to advance an Accelerated Bridge Construction (ABC) option. This option included a  weekend detour of the 2,500 ADT, facilitated through the extensive use of precast components. Early communication with area businesses was critical in securing buy-in for this ABC approach. 

Back

S.R. 0070 Section 026

Michael Kilgore

Before

$2.47 Million
Client: Engineering District 9-0
Contact: Mr. Randy Swales (814-696-6834)
Project Letting: July 2008

Bridge Replacement - This project is a design/build bridge replacement project. This project is for the removal of the dual three-span bridges carrying the Interstate 70 (I-70) eastbound and westbound lanes over T-390 (Lodge Road) and replacement with a precast concrete arch structure. SPK prepared the concept contract plans, including roadway, traffic control, E&S control, and structure conceptual plans, and provided design review services as well.