Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Traffic Control Plans

S.R. 0070 Section N20

Michael Kilgore

Cost: $5.57 million
Project Length: 3,719' (0.704 mile)
Client: Gulisek Construction, LLC
Contact: Mr. Clayton Stahl (724-696-3341)
Project Letting: December 2010

Bridge Replacement - This project is a design-build bridge replacement project. The project included the removal of a single span bridge carrying Interstate 70 (I-70) eastbound and westbound over S.R. 3014. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor. 

 

 

S.R. 0070, Section 10Q

Michael Kilgore

Project Cost: $8.62 Million
Client: Engineering District 12-0
Contact: Mr. Jerry Bendo (724-439-7377)
Project Letting: June 2010

 Bridge Replacement - Westmoreland County - This project is a design-build bridge replacement project. The project included the removal of a dual three-span bridge carrying Interstate 70 (I-70) eastbound and westbound over a single track of the Wheeling & Lake Erie Railroad. SPK prepared the conceptual contract plans and specifications including the roadway plans, traffic control plans, E&S control plans, and structure plans. SPK is currently providing design review services as well.