Projects

SPK Engineering's past projects

Filtering by Tag: E&S Control Plan

T.R. 618

Michael Kilgore

 Project Cost: $56 Million
 Client: Donegal Construction
Contact: Mr. Ronald Holsopple (724-423-7500)

(Simpson Chapel Road) - Greene County - This project is a design-build contract to replace a collapsed bridge with a single lane dual-cell box culvert (2 - 21’ spans) for Greene County. The project also included 350 LF of roadway reconstruction. SPK prepared the final construction plan and structure plan, E&S Control plan, and the GP-11 permit application for the contractor.

S.R. 0070, Section 10Q

Michael Kilgore

Project Cost: $8.62 Million
Client: Engineering District 12-0
Contact: Mr. Jerry Bendo (724-439-7377)
Project Letting: June 2010

 Bridge Replacement - Westmoreland County - This project is a design-build bridge replacement project. The project included the removal of a dual three-span bridge carrying Interstate 70 (I-70) eastbound and westbound over a single track of the Wheeling & Lake Erie Railroad. SPK prepared the conceptual contract plans and specifications including the roadway plans, traffic control plans, E&S control plans, and structure plans. SPK is currently providing design review services as well.

S.R. 0166 Section V10

Michael Kilgore

Project Cost: $1.688 million
Client: Frank Gavlik & Sons, Inc.
Contact: Mr. Robert Gavlik, Jr. (724-239-2411)
Project Letting: December 2010

Bridge Replacement - Fayette County - This project is a design-build bridge replacement project. The project included the removal of a two span bridge carrying S.R. 0166 over Dunlap Creek. The replacement structure is a single span (115’ span) P/S Bulb-Tee Integral Abutment Bridge. SPK prepared the final construction plans, E&S Control plans, and structure plans for the contractor.