S.R. 0219 Section 28B

Michael Kilgore

Before

After

Cost: $191,000.00
Client: PennDOT Engineering District 9-0

Boynton Bridge Preservation - The primary focus was to underpin the scour-critical Boynton Bridge. Reinforced concrete underpinning was constructed in an undermined area of an abutment. A Cross-Rock Vane and J-Hook Vane were installed upstream and downstream respectively, and rock protection was installed at the pier to mitigate future scour. Minor concrete repairs were also included in the contract.
 

S.R. 0869 Section 002

Michael Kilgore

Cost: $825,000
Project Length: 562 feet
Client: PennDOT Engineering District 9-0

Bridge Replacement and Approach Adjustments - This project included a Two-Span (Overall span length -101 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0869 over Bobs Creek.

S.R. 1023 Section 001

Michael Kilgore

Cost: $1.22 Million
Project Length: 737.6 Feet
Client: Engineering District 9-0
Contact: Ms. Monica Farabaugh (814-696-7160)

Clearfield Creek Bridge Replacement - This project included a single span (96.6’ c/c brgs.) precast concrete spread box beam bridge over Clearfield Creek. The project also included 641’ of approach roadway reconstruction.