S.R. 0219 Section 28B
Michael Kilgore
Cost: $191,000.00
Client: PennDOT Engineering District 9-0
Boynton Bridge Preservation - The primary focus was to underpin the scour-critical Boynton Bridge. Reinforced concrete underpinning was constructed in an undermined area of an abutment. A Cross-Rock Vane and J-Hook Vane were installed upstream and downstream respectively, and rock protection was installed at the pier to mitigate future scour. Minor concrete repairs were also included in the contract.