Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Boynton Bridge

S.R. 0219 Section 28B

Michael Kilgore

Before

After

Cost: $191,000.00
Client: PennDOT Engineering District 9-0

Boynton Bridge Preservation - The primary focus was to underpin the scour-critical Boynton Bridge. Reinforced concrete underpinning was constructed in an undermined area of an abutment. A Cross-Rock Vane and J-Hook Vane were installed upstream and downstream respectively, and rock protection was installed at the pier to mitigate future scour. Minor concrete repairs were also included in the contract.