Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Bedford

S.R. 1034, Section 01B

Michael Kilgore

20210816_093745 copy.jpg
Before

Before

After

After

IMG_0771B.jpg
IMG_0779.JPG

Cost: $1,378,778
Client: PennDOT District 9-0
Contact: Michael E. Stone, P.E. (micstone@pa.gov)
Project Letting: September 17, 2020

This project consisted of the replacement of an existing bridge and realignment of a roadway. The realignment shifted the S.R. 1034/T-6134 intersection of S.R. 0915 (Sandy Run Road) 465’ downstream to improve the overall geometry. The replacement structure is a precast reinforced concrete arch culvert (36’ span) with cast-in-place concrete footings and pedestals along with precast concrete wingwalls.

S.R. 1020 Section 001

Michael Kilgore

Cost: $3 million
Client: PennDOT Engineering District 9-0
Contact: Ms. Monica Farabaugh (814-696-7160)

Cypher Bridge Rehabilitation - This project includes the rehabilitation of a two span steel historic truss over the Raystown Branch of the Juniata River and a cast-in-place concrete rigid frame replacement structure (24'-0" span) over Pipers Run. The project also includes 1,338' of approach roadway reconstruction.  

S.R. 0869 Section 002

Michael Kilgore

Cost: $825,000
Project Length: 562 feet
Client: PennDOT Engineering District 9-0

Bridge Replacement and Approach Adjustments - This project included a Two-Span (Overall span length -101 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0869 over Bobs Creek.