Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 3017 Section A01

Michael Kilgore

Project Cost: $1.44 million
Project Length: 504'
Project Letting - 2011
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Bald Eagle Creek - This project included the replacement of an existing bridge with a prestressed concrete spread box beam bridge (79’ span). The project also included 425’ of approach roadway reconstruction.
 

S.R. 3011 Section A01

Michael Kilgore

Cost: $0.84 Million
Project Length: 559'
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

(Bridge Replacement) Bell Run Bridge - This project included a single span (59’-6” c/c brgs.) precast concrete spread box beam bridge with integral abutments. The project also included 500’ of approach roadway reconstruction. 

S.R. 2001 Section A02

Michael Kilgore

Cost: $1.23 million
Client: PennDOT Engineering District 2-0
Contact: Mr. Tom Zurat, P.E. (814-762-5037)
Project Letting: 2012
Project Completion: November 2012

Bridge Replacement - This project included a two span (146.3’ overall span) prestressed concrete spread box beam bridge carrying S.R. 1002 over Jack’s Creek. The project also included 500’ of roadway reconstruction.