S.R. 3017 Section A01
Michael Kilgore
Project Cost: $1.44 million
Project Length: 504'
Project Letting - 2011
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Bald Eagle Creek - This project included the replacement of an existing bridge with a prestressed concrete spread box beam bridge (79’ span). The project also included 425’ of approach roadway reconstruction.