S.R. 4025 Section A00
Michael Kilgore
Cost: $3.0 Mil.
Project Length:873 feet, 0.165 mile
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (Retired)
Bridge Replacement - This project included a Three-Span (Overall span length 296) Continuous Composite
Prestressed Concrete Bridge which carries S.R. 4025 over S.R. 4027, Reed Street, and Coal Run. The entire
length of the project was 873 feet, 0.165 mile. The structure was replaced on a new alignment to improve geometry
and allow traffic to be maintained at all times.