Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Continuous Composite Prestressed Concrete Bridge

S.R. 0136, Sections A10/109

Michael Kilgore

 Project Cost: $3.7 Million
Client: Engineering District 12-0
Contact: Mr. William Oshnack (724-439-7321)
Project Letting - 1997

(Roadway Reconstruction and Bridge Replacement) Washington County - This project included a Two-Span (Overall span length – 154’) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0136 over S.R. 0070 (I-70).  This project also included improvements to 3,925’ (0.743 mile) of S. R. 0136 (Beau Street).  Two (2) new traffic signals, one (1) at Township Road 919 (Clare Drive) and one (1) at S.R. 1014 (Lakeview Drive)/ Washington Mall Entrance, were constructed as part of this project.

S.R. 0381 Section C10

Michael Kilgore


 Cost: $2.7 Million
Client: PennDOT Engineering District 12-0

Meadow Run Bridge Replacement and Roadway Improvements - This project included a Three-Span Continuous Composite Prestressed Concrete Bridge. It also included 1,000 feet of roadway approach and a connection to existing S.R. 2019. The structure was constructed in half-widths so as to maintain traffic at all times.

 

S.R. 0188 Section C10 & C11

Michael Kilgore

Cost: $1.0 Million
Client: PennDOT Engineering District 12-0


Bridge Replacements - This project included a Two-Span (Overall span length - 122') Continuous Composite Prestressed Concrete Bridge carrying S.R. 0188 over the South Fork of Tenmile Creek and a 16' x 7' Precast Concrete Box Culvert carrying S.R. 0188 over Bradens Run.