S.R. 2004 Section A03
Michael Kilgore
Cost: $0.655 million
Project Length: .064 Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Eric Brown, P.E. (814-768-0722)
Duck Run Bridge Replacement - This project includes a single span (50'-0" c/c brgs.) precast concrete spread box beam bridge over Duck Run. The project also includes 290' of approach roadway reconstruction