S.R. 0006 Section 621
Michael Kilgore
Cost: - $1.8 million
Client: PennDOT, District 2-0
Contact: Mr. Heath Brendlinger, P.E
Potter County - This project consisted of preliminary design for approximately 9,000’ of pavement restoration, drainage and guide rail upgrades. The project consisted of a mill and overlay with reconstructed shoulders and full depth pavement replacement in isolated base failure areas and pipe crossings. The project also included bridge preservation details to perform maintenance on existing structures within the project limits. Pavement cross slopes for travel lanes were evaluated within horizontal curves and corrected to meet 3R design criteria. Final Design, Construction Plan and Bid Package was completed by District 2-0.