S.R. 0381 Section C10
Michael Kilgore
Cost: $2.7 Million
Client: PennDOT Engineering District 12-0
Meadow Run Bridge Replacement and Roadway Improvements - This project included a Three-Span Continuous Composite Prestressed Concrete Bridge. It also included 1,000 feet of roadway approach and a connection to existing S.R. 2019. The structure was constructed in half-widths so as to maintain traffic at all times.