S.R. 1031 Section F00
Michael Kilgore
Cost: $1.11 million
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (Retired)
Bridge Replacement - This project included the replacement of a single span thru-truss with a two span (41.696 m overall span) prestressed concrete adjacent box beam bridge over Jacobs Creek. The project also included 0.245 km of approach roadway reconstruction.