Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 2016 Section A01

Michael Kilgore

Before

Cost: $2.26 Million
Client: Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Project Letting - August 2014

This project consists of a two span continuous (140’ overall c/c brgs) prestressed concrete spread box beam bridge carrying S.R. 2016 (Main Street) over Fishing Creek. The project also included retaining a portion of the existing bridge to maintain pedestrian traffic during construction, and 1,050 LF of approach roadway reconstruction.

S.R. 0449, Section A02

Michael Kilgore

After

Before

Before

after

after

after

 

Cost: $1.04 million
County: Potter County
Client: PennDOT District 2-0
Contact: Mr. Craig Sattesahn, P.E. (814-765-0678)
Project Letting: January 2015

This project is the replacement of an existing bridge carrying S.R. 0449 (North Brookland Road) over Pine Creek. The replacement structure is a precast concrete box culvert (18’ normal clear span). A temporary roadway and stream crossing are included in the project to maintain traffic during construction. The project also includes 587 LF of roadway reconstruction.

S.R. 0080 Section B09

Michael Kilgore

Project Cost: $43.0 million
Project Length: 7.22 Miles WB 7.29 Miles EB
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Interstate Roadway and Bridge Reconstruction - This project includes a Dual Five-Span (Overall span length - 439.5 feet WB/458.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 0220 (Milesburg Interchange); a Dual Three-Span (Overall span length - 274.0 feet WB and EB) carrying S.R. 0080 WB and EB over Bald Eagle Creek; and a Dual Single-Span (Overall span length - 65.2 feet WB/73.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 1006. The project also includes the reconstruction of the Milesburg Interchange (S.R. 0080/S.R. 0220).