Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Roadway Adjustment

S.R. 0085 Section 150

Michael Kilgore

Cost: $1.0 Mil.
Project Length:1,285 feet
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E. (724-357-2852)

Bridge Replacement and Roadway Adjustments - This project included a Two-Span (Overall span length - 92 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0085 over Cowanshannock Creek.

Final Project 9/27/2005

S.R. 0088 Section 06R

Michael Kilgore


 Cost: $2.6 million
Client: PennDOT Engineering District 12-0
Contact: Ron Deems (Retired)

Dilliner Bridge Replacement - This project included the replacement of a single span thru-truss with a three span (82.6 m overall span) prestressed concrete spread box beam bridge over Dunkard Creek and a private railroad. The project also included 0.286 km of off-line approach roadway adjustments.