S.R. 0088 Section 06R
Michael Kilgore
Cost: $2.6 million
Client: PennDOT Engineering District 12-0
Contact: Ron Deems (Retired)
Dilliner Bridge Replacement - This project included the replacement of a single span thru-truss with a three span (82.6 m overall span) prestressed concrete spread box beam bridge over Dunkard Creek and a private railroad. The project also included 0.286 km of off-line approach roadway adjustments.