Project Cost: $1.83 Million (Current Estimate)
Client: Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Project Letting - Summer 2015
The project consists of the replacement of the existing two-span reinforced concrete T-beam bridge that carries S.R. 0064 over Fishing Creek at segment 0020, offset 1070. A single-span adjacent box beam bridge with conventional abutments is proposed. Minimal roadway approach work will be included for approximately 160 feet on the western approach and 190 feet on the eastern approach. Traffic control will consist of half-width phased construction, and single lane traffic controlled with temporary signals. Client: Engineering District 2-0; Contact: Mr. Mark Kucherer, P.E. (814-765-0440); Project Letting - Summer 2015.