S.R. 4013 Section A10
Michael Kilgore
Cost: $3.29 million
Project Length:1,182 Feet
Client: PennDOT Engineering District 12-0
Contact: Mr. Barry Lyons (724 439-7336)
Bridge Replacement - The project included a three span (182’ - 2 ¾” c/c brgs.) precast concrete
spread box beam bridge over Norfolk Southern’s dual track high-speed railroad. The project included
approximately 1,000 feet of roadway relocation and reconstruction to accommodate required vertical
clearances over the railroad as well as to maintain traffic throughout construction.