SPK Engineering's past projects

Filtering by Category: District 9

S.R. 0022 Section 032

Michael Kilgore

Cost: $1.6 million
Project Length: Approximately 510 Feet
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford and Nick Vivian (814-696-7197)

Bridge Superstructure Replacement - The project included a two span (106’ – 6” c/c brgs.) Continuous Composite Galvanized Steel I-Beam bridge over the Beaverdam Branch of Juniata River. The project included approximately 400 feet of roadway approach work and utilized a phased construction sequence to maintain traffic throughout construction.
 

S.R. 0022 Section 024

Michael Kilgore

Cost: $1.93 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Bill Ratchford (814-696-7159)

Duncansville Bridge - This project includes a single span (68.0’ c/c brgs.) precast concrete adjacent box beam bridge over Blair Gap Run. The project also includes minor approach roadway reconstruction, two waterline replacements, complex phasing and utility phasing requirements in order to maintain traffic during construction.

 

S.R. 1012 Section 001

Michael Kilgore


 Price: $1.43 million
Client: Engineering District 9-0
Contact: James Pruss (814-696-6850)

Clearfield Creek Bridge #2 – Emergency Bridge Replacement over Clearfield Creek - This project included a single span (100’-0” overall c/c brgs.) precast concrete adjacent box beam bridge. The bridge was replaced on an emergency basis due to failure of the existing steel truss from traffic damage. The project also included approximately 675’ of approach roadway work.