S.R. 1012 Section 001
Michael Kilgore
Price: $1.43 million
Client: Engineering District 9-0
Contact: James Pruss (814-696-6850)
Clearfield Creek Bridge #2 – Emergency Bridge Replacement over Clearfield Creek - This project included a single span (100’-0” overall c/c brgs.) precast concrete adjacent box beam bridge. The bridge was replaced on an emergency basis due to failure of the existing steel truss from traffic damage. The project also included approximately 675’ of approach roadway work.