S.R. 0022 Section 024
Michael Kilgore
Cost: $1.93 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Bill Ratchford (814-696-7159)
Duncansville Bridge - This project includes a single span (68.0’ c/c brgs.) precast concrete adjacent box beam bridge over Blair Gap Run. The project also includes minor approach roadway reconstruction, two waterline replacements, complex phasing and utility phasing requirements in order to maintain traffic during construction.