Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Emergency Bridge Replacement

S.R. 0018 Section Y10/Z10

Michael Kilgore

Cost: $2.42 Mil.
Client: Engineering District 12-0
Contact: Troy Pritts, P.E.(724-415-2401)
Project Letting - March 19, 2007

This project was the emergency replacement of two (2) structures; one (1) carrying S.R. 0018 over Bates Fork Creek and one (1) over Browns Run and included approach roadway work.

S.R. 1012 Section 001

Michael Kilgore


 Price: $1.43 million
Client: Engineering District 9-0
Contact: James Pruss (814-696-6850)

Clearfield Creek Bridge #2 – Emergency Bridge Replacement over Clearfield Creek - This project included a single span (100’-0” overall c/c brgs.) precast concrete adjacent box beam bridge. The bridge was replaced on an emergency basis due to failure of the existing steel truss from traffic damage. The project also included approximately 675’ of approach roadway work. 

S.R. 3077 Section A10

Michael Kilgore

Client: PennDOT Engineering District 12-0
Contact: Mr. Sean Sepe, P.E. (724 439-7322)

Emergency Bridge Replacement - Conceptual Design for Design-Build Proposal & Design Review
The project included the emergency replacement of a single span concrete structure with a 12' precast
concrete box culvert carrying S.R. 3077 over branch of Little Sewickley Creek.