Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 10

S.R. 0356 Sections 06M/152

Michael Kilgore

Cost: $69 million
Client: PennDOT District 10-0
Contact: Mr. Mark Rozich, P.E. (724-357-2852
Client: Engineering District 12-0
Contact: Mr. Troy Pritts, P.E. (724-415-2401)
Project Letting - June 2010

Freeport Bridge Rehabilitation - Westmoreland, Allegheny, Butler & Armstrong Counties - This project consisted of the major rehabilitation of the Freeport Bridge, reconstruction and realignment of the approach roadways, and replacement of the Buffalo Creek Bridge. The design for the Freeport Bridge included the replacement of the approach spans and rehabilitation/widening of the main river truss spans (performed by others). The Buffalo Creek Bridge replacement structure is a three (3) span P/S Concrete AASHTO I-Beam Bridge (340’ total). The project also included two (2) traffic signals, highway lighting, and a sewer relocation plan. SPK worked closely with both District 10-0 and District 12-0 throughout the design process.
 

 

S.R. 0080 Section 591

Michael Kilgore

Cost: $1.68 Million
Client: Engineering District 10-0
Contact: Mr. Thomas Baltz (724-357-2982)
Project Letting: August 2009

Sound Barrier Wall - This project included design of a 1,980’ sound barrier wall along Interstate 80 adjacent to Brookville Borough. The project was integrated into an S.R. 0080 Brookville Interchange Reconstruction Project (S.R. 0080, Section 545 - $9.11 million).