Projects

SPK Engineering's past projects

Filtering by Tag: Butler

S.R. 0038 Section 259

Michael Kilgore

Before

Before

After

After

IMG_3535.JPG

Project Cost: $862,651
Client: PennDOT District 10-0
Contact: Doug Zubal, P.E.
Project Letting: December 2017

S.R. 0038, Section 259 is located in Concord Township, Butler County.  The project consists of the replacement of the reinforced concrete arch culvert that carries SR 0038 over a tributary to Connoquenessing Creek with a precast reinforced concrete box culvert.  The horizontal and vertical alignment match the existing roadway. Minimal roadway approach work was included for approximately 200 feet on the western approach and 250 feet on the eastern approach. One lane of traffic was maintained throughout construction of the project via half-width construction, controlled with temporary traffic signals.   

 

S.R. 0356 Sections 06M/152

Michael Kilgore

Cost: $69 million
Client: PennDOT District 10-0
Contact: Mr. Mark Rozich, P.E. (724-357-2852
Client: Engineering District 12-0
Contact: Mr. Troy Pritts, P.E. (724-415-2401)
Project Letting - June 2010

Freeport Bridge Rehabilitation - Westmoreland, Allegheny, Butler & Armstrong Counties - This project consisted of the major rehabilitation of the Freeport Bridge, reconstruction and realignment of the approach roadways, and replacement of the Buffalo Creek Bridge. The design for the Freeport Bridge included the replacement of the approach spans and rehabilitation/widening of the main river truss spans (performed by others). The Buffalo Creek Bridge replacement structure is a three (3) span P/S Concrete AASHTO I-Beam Bridge (340’ total). The project also included two (2) traffic signals, highway lighting, and a sewer relocation plan. SPK worked closely with both District 10-0 and District 12-0 throughout the design process.