S.R. 0356 Section 251

Michael Kilgore

Cost: $1.1 million
Project Length: 284'
Client: PennDOT Engineering District 10-0


SR 0356, Section 251 – Butler County – Rehabilitation of a four span (284’ total span) combination adjacent/spread box beam bridge carrying SR 0356 over SR 0028. The rehabilitation work included the replacement of the existing concrete deck and repairs to the existing beams and substructures. The bridge rehabilitation was incorporated into a 3R project prepared by District 10-0. 
 

 

S.R. 0119 Section 496

Michael Kilgore

Cost: $72.0 Mil.
Project Length:14.05 km
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E.(724-357-2852)

Route 119 South Improvement Project - This project includes 14.05 km of roadway widening, eleven structures, three new signals, a parallel bike trail, and the relocated interchange of S.R. 0119 with S.R. 0022.
 

 

S.R. 0068 Section 153

Michael Kilgore

Cost: $3.472 Mil.
Client: PennDOT District 10-0
Ms. Alicia Kavulic (724-357-7614)
Project Letting - 2010

This project consisted of replacing five (5) structures; four (4) on S.R. 0068 and one (1) on S.R. 4007. The project included a combined 1,739’ of approach roadway reconstruction. The four (4) structures on S.R. 0068 were box culverts and were replaced via phased construction. The structure on S.R. 4007 was a Con-Span structure and was replaced utilizing a limited-duration detour. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.

Final Project 9/27/2012

Before Project 12/3/08

Before Project 12/3/08