Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Signal

S.R. 0119 Section 496

Michael Kilgore

Cost: $72.0 Mil.
Project Length:14.05 km
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E.(724-357-2852)

Route 119 South Improvement Project - This project includes 14.05 km of roadway widening, eleven structures, three new signals, a parallel bike trail, and the relocated interchange of S.R. 0119 with S.R. 0022.
 

 

S.R. 4034 Section A60

Michael Kilgore

Cost: $26 million
Project Length: 6,005 Feet
Client: PennDOT Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

This project included 6,005' of new highway construction with three structures and railroad relocation. The two structures designed by SPK included a single span (82.66' c/c brgs.) prestressed concrete spread box beam bridge over S.R. 0020 (Broad Street) and a two span (184.86' overall span) prestressed concrete spread box beam bridge over S.R. 4034 and the tracks of Norfolk Southern Railroad. The project also includes four signals, highway lighting, and landscaping of the new corridor.

 

S.R. 0019 Section A01/A02

Michael Kilgore

Cost: $3.6 million
Project Length: 1.35 Miles
Client: PennDOT Engineering District 1-0
(Peach Street) Roadway Improvements (5 Intersections) -This project consisted of widening S.R. 0019 to accommodate a fifth center turning lane. It was located in a highly commercialized congested area. The project also included the design of a coordinated signal system (Six 6 signals).