Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 10

S.R. 0085 Section 150

Michael Kilgore

Cost: $1.0 Mil.
Project Length:1,285 feet
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E. (724-357-2852)

Bridge Replacement and Roadway Adjustments - This project included a Two-Span (Overall span length - 92 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0085 over Cowanshannock Creek.

Final Project 9/27/2005

S.R. 8010, Section 150

Michael Kilgore

 Project Cost: $4.20 Million (current estimate)
 Client: Engineering District 10-0
Mr. Jason Layman (724-357-7614)
Project Letting - August 2014

(Garrett’s Ramp) - ECMS #E02720 - Armstrong County  - This project consists of a single span (144’ c/c brgs) fabricated steel plate girder bridge carry S.R. 8010 (Ramp CF) over S.R. 0422. The project also included 800 LF of roadway reconstruction.

S.R. 0119 Section 571

Michael Kilgore

Cost: $720,00.00
Client: Engineering District 10-0
Contact: Mr. Mark Rozich, P.E. (724-357-2852)

Bell’s Mills Intersection Improvement - The project consisted of the addition of a left turn lane as well as excavation and grading of the existing slopes to improve intersection sight distance. Two (2) residential structures were displaced as a result of the excavation. In addition, resurfacing and shoulder reconstruction was performed.