S.R. 4009 Section 002
Michael Kilgore
Cost: $2.7 Million
Client: PennDOT Engineering District 9-0
(Bridge Replacement) - This project included a Three-Span (Overall span length 190’) Continuous Composite Prestressed Concrete Bridge carrying S.R. 4009 over the Raystown Branch of the Juniata River. The structure was constructed in half-widths so as to maintain two-way traffic at all times.