Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Turnpike

PA Turnpike WB-224B Superstructure Replacement

Michael Kilgore

Cost: $5.48 million
Client: PA Turnpike Commission
Contact: Walter W. Wimer, P.E. (717-831-7590)
Project Letting - October 2016

This project was initially the full replacement of a bridge carrying mainline Turnpike over Brush Creek. The project modified the scope for a superstructure-only replacement project, incorporating ABC strategies. The existing superstructure is a two span non-composite adjacent box beam bridge with two lanes in each direction and relatively narrow shoulders. SPK developed final plans for a two span continuous steel superstructure which minimizes the impacts to the Turnpike traffic and utilizes the existing substructure. 

new.jpg

This was the first ABC slide project on PTC
mainline, completed in less than 55 hours
 and won the 2017 Accelerated Bridge
 Construction (ABC) Annual Conference
award for best Superstructure Slide
Project in Miami, FL December 7, 2017.
 

 

PTC WB-228

Michael Kilgore

Cost: $3.62 million
Client: PA Turnpike Commission
Contact: Ken Slippey, (717-939-9551x-5150)
Project Letting 2012

PTC WB-228 Bridge Replacement - This bridge replacement project carrying S.R. 0989 over the mainline PTC. The replacement structure is a two-span (177’-10 ½” overall span) precast concrete bulb-tee bridge, sized to accommodate the future widening of the PA Turnpike. 
 

B-465A & B-465 Mileposts 197.19 & 197.20

Michael Kilgore

Project Cost: $5 Million
Project Length: 0.38 Mile
Client: Pennsylvania Turnpike
Contact: Brad Updegrave, P.E., (717-939-9551 x-3675)

(Bridge Replacement) - Franklin County - This project includes the replacement of two (2) separate bridges carrying S.R. 4006 (Cold Springs Road) over the eastbound and westbound Pennsylvania Turnpike with a two-span continuous curved-steel plate girder bridge (344’ total span). The roadway was realigned to permit uninterrupted traffic on S.R. 4006 throughout construction. The project also includes high-mast lighting, drainage, temporary lighting, and traffic control provisions on the Turnpike for demolition
and erection activities. The design team included Earth, Inc.  
 

Finished Project 4/30/07

Finished Project 4/30/07

Finished Project 4/1/07

Finished Project 4/1/07

 

Girder Erection
10.16.06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06