Projects

SPK Engineering's past projects

Filtering by Tag: Franklin

S.R. 0997 Section 026

Michael Kilgore

IMG_0717B.jpg
After

After

Before

Before

IMG_0726.JPG

Project Cost: $1.8 million
Client: PennDOT District 8-0
Contact: Benjamin Singer, P.E. (717-787-6690)
Project Letting - May 2017
Construction completed October 2018

The project consisted of replacing the existing two-span Concrete T-Beam Bridge that carries S.R. 0997 over Conodoguinet Creek with a new single span Composite Steel Plate Girder Bridge on integral abutments.  Roadway approach work was included for approximately 300 feet on the southern approach and 500 feet on the northern approach.  The design maintained existing horizontal alignment, while the vertical alignment was slightly adjusted to allow for adequate clearance over Conodoguinet Creek. Traffic control consisted of phased construction, two-way traffic maintained by a single lane using temporary traffic signals.

Back

B-465A & B-465 Mileposts 197.19 & 197.20

Michael Kilgore

Project Cost: $5 Million
Project Length: 0.38 Mile
Client: Pennsylvania Turnpike
Contact: Brad Updegrave, P.E., (717-939-9551 x-3675)

(Bridge Replacement) - Franklin County - This project includes the replacement of two (2) separate bridges carrying S.R. 4006 (Cold Springs Road) over the eastbound and westbound Pennsylvania Turnpike with a two-span continuous curved-steel plate girder bridge (344’ total span). The roadway was realigned to permit uninterrupted traffic on S.R. 4006 throughout construction. The project also includes high-mast lighting, drainage, temporary lighting, and traffic control provisions on the Turnpike for demolition
and erection activities. The design team included Earth, Inc.  
 

Finished Project 4/30/07

Finished Project 4/30/07

Finished Project 4/1/07

Finished Project 4/1/07

 

Girder Erection
10.16.06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06