S.R. 3006 Section E10
Michael Kilgore
Cost: $1.474 Mil.
Client: PennDOT District 12-0
Contact: Mr. Barry Lyons (724-439-7336)
Project Letting: 2009
This project consisted of replacing a two-span bridge with a two span (92.2’ span) bridge over York Run. The project included 800’ of approach roadway reconstruction. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.