S.R. 0166 Section S10
Michael Kilgore
Cost: $1.55 Mil.
Client: PennDOT District 12-0
Contact: Mr. Troy Pritts, P.E. (724-415-2401)
Project Letting: 2008
This project consisted of replacing a two-span bridge with a single span (77.4’ span) bridge over Dunlap Creek. The project included 607’ of approach roadway reconstruction and was constructed in phases. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.