Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Phased Replacement

S.R. 0764 Section 20B

Michael Kilgore

After

After

Before

Before

After

After

Cost: $2.094 Million
Client: PennDOT Engineering District 9-0
Contact: Ms. Tracey Farabaugh, P.E. (814-696-6841)
Project Letting: January 2016

Blair County -  This project included the phased replacement of a deteriorated single span concrete T-beam bridge over Sandy Run with a single span spread box beam bridge (76.0’ c-c brgs.). The project also included 2,898’ of approach roadway construction.

S.R. 2004, Section 04B

Michael Kilgore

Final

Final

Project Cost: $1.63 million
Client: PennDOT Engineering District 9-0
Contact: Ms. Kristen Swan (814-696-6840)
Project Letting - September 2014

Somerset County - Fairgrounds Bridge Replacement - This project included the phased replacement of a very deteriorated two-span concrete T-beam bridge carrying S.R. 2004 over Elk Lick Creek in Summit Township, Somerset County. The replacement structure is a single span (102.75’) prestressed concrete bulb tee bridge, detailed to include a minor flare in the deck to accommodate the entrance to the Somerset County Fairgrounds. The project also included 725’ of minor roadway realignment and reconstruction. The construction phasing and associated CPM was developed to ensure the bridge was opened to two lanes of traffic for the annual fair which is scheduled for the second week of August.