S.R. 0764 Section 20B
Michael Kilgore
Cost: $2.094 Million
Client: PennDOT Engineering District 9-0
Contact: Ms. Tracey Farabaugh, P.E. (814-696-6841)
Project Letting: January 2016
Blair County - This project included the phased replacement of a deteriorated single span concrete T-beam bridge over Sandy Run with a single span spread box beam bridge (76.0’ c-c brgs.). The project also included 2,898’ of approach roadway construction.