Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Detour

S.R. 0997, Section 027

Michael Kilgore

During

During

Cost: $1.22 Million
Client: PennDOT District 8-0
Contact: Mr. Benjamin Singer, P.E. (717-787-6690)
Project Letting - April 2016

Franklin County - This project consisted of the replacement of the existing single span Steel I-Beam Bridge that carries S.R. 0997 over Muddy Run with a new single span Prestressed Spread Box Beam Bridge on integral abutments.  Minimal roadway approach work was included for approximately 250 feet on the southern approach and 100 feet on the northern approach.  The design maintained existing horizontal alignment, while the vertical alignment was slightly adjusted to allow for adequate clearance over Muddy Run.  Traffic control consisted of a detour.

S.R. 0234 Section 015

Michael Kilgore

Before

After

Cost: 1.2 Million
Project Length: Approximately 625 Feet
Client: PennDOT Engineering District 8-0
Contact: Ben Singer (717-787-6690)

Bridge Replacement - The Project included a single span (78' C/C Bearings) composite prestressed concrete beam bridge over Paradise Creek. The project included approximately 550 feet of roadway approach work and utilized a detour to maintain traffic.