S.R. 0234 Section 015
Michael Kilgore
Cost: 1.2 Million
Project Length: Approximately 625 Feet
Client: PennDOT Engineering District 8-0
Contact: Ben Singer (717-787-6690)
Bridge Replacement - The Project included a single span (78' C/C Bearings) composite prestressed concrete beam bridge over Paradise Creek. The project included approximately 550 feet of roadway approach work and utilized a detour to maintain traffic.