Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Concrete Median Barrier

S.R. 0119 Section 133

Michael Kilgore

Project Length: 2.3 miles
Client: PennDOT Engineering District 12-0
Contact: Mr. Bill Oshnack (724-439-7321)

Roadway Widening - This project involved the widening of approximately 2.3 miles of S.R. 0119 to accommodate left turn stacking lanes, mounted curbs, and a concrete median barrier at three intersections. The scope of work involved resurfacing, milling, patching, and shoulder reconstruction. New traffic signals were proposed at seven intersections. Pavement markings and signing were also proposed to address safety concerns in the project area. Skelly and Loy prepared a CEE for the project, which received environmental clearance in December 1999.