Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 3003 Section 001

Michael Kilgore

Before

After

Cost: $1.388 million
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford

The Poplar Run Bridge was a job designed using the PennDOT BRADD program. The structure length is 80'-0" c-c of brgs, it has a roadway width of 30'-3", it has a skew of 45 degrees and galvanized reinforcing was used in the deck and barriers. It was constructed in 3 months, June to August, to coincide with the summer break from school and eliminate any conflicts with school bus routing.